The project proposal foresees the construction and commissioning of a photovoltaic power plant  with a capacity of 100 kW, along with the implementation of a battery energy storage system, as well as the installation of five heat pumps with a capacity of 10 kW each. The investment will be implemented on the territory of a commercial facility and is to be realized under Priority 2 “Circular Economy,” Specific Objective RSO2.1 - “Promoting Energy Efficiency and Reducing Greenhouse Gas Emissions,” aimed at increasing the energy independence and sustainability of the enterprise through the use of renewable energy sources.

The photovoltaic system will provide a significant portion of the electricity needed for the enterprise’s operational needs, reducing dependence on external energy sources and contributing to lower electricity costs. The installed heat pumps will utilize renewable energy resources for heating and cooling, leading to optimized energy expenses and reduced greenhouse gas emissions.

The implementation of the project will contribute to reducing the carbon footprint, improving energy autonomy, and stabilizing production costs.

The project is aligned with national and European policies for energy transition and sustainable development and complies with the principle of “do no significant harm” to the environment. The expected impact is an increase in energy efficiency, competitiveness, and sustainability of the enterprise.
None

Notes:

Elements in light blue allow detailed view when selected
All amounts are in euro (EUR) / 1 EUR = 1,95583 BGN
The project is funded by the “Technical Assistance” Programme 2021–2027, co-financed by the European Union through the European Regional Development Fund, under project BG16RFTA001-1.003-0001 “Digital transformation in the management of EU funds” and by the “National Recovery and Resilience Plan”, under Investment C10.I11 “Ensuring an adequate information and administrative environment for the implementation of the Recovery and Resilience Plan”.