One of the company's buildings in the production base is intended for the installation of new production equipment, which is being acquired under another project. This includes machines with digital control, for the operation of which it is necessary to maintain an appropriate temperature regime. The building is old, which determines the need for modern energy renovation, permissible by law. In addition to the described, the commissioning of new equipment (machines) will increase the company's energy consumption by at least 15 kW. It is known that in the conditions of the free electricity market, the costs of legal entities have increased many times and burdened the economic condition of the company. The provided opportunity for grant financing provides an opportunity both to reduce energy costs by using solar energy, and to significantly reduce energy losses for heating/cooling. The project proposal provides for the implementation of: - Thermal insulation of the roof and walls of the building in question, including with transparent fences; - Ensuring efficient and effective heating and cooling of buildings through heat pumps; - Providing additional power supply through PvPP for own needs. According to an initial assessment, PvPP with a capacity of about 20-25 kW - panels and battery can be installed. This project proposal also provides for Thermal insulation systems of sandwich panels for the roof (217 sq. m), Thermal insulation for walls and floors (90 sq. m), transparent enclosing structures (34 sq. m). It is planned to acquire and install 5 pcs. heat pumps of 12.3 kW each, as well as install PvPP with a capacity of 20 kW, including a battery. The delivery and installation will be assigned to an external contractor selected through a Public Invitation. During the implementation, European legislation will be strictly observed - excluding discrimination, avoiding negative impact on nature, ensuring transparency and appreciation for the funds provided.
None