Saved trees
UMIS AND ITS USERS CONTRIBUTED TO SAVING 77 625 TREES
Български

Programme: Programme "Competitiveness and Innovation in Enterprises" 2021-2027

Planning region: All

Description

The project of "TAL ENGINEERING" EOOD envisages the integration of an energy storage system (batteries) to an existing photovoltaic power plant (PPP) of the enterprise in the village of Kazichene, Industrial Zone "Kazichene-West".
The investment includes the delivery, installation and commissioning of:
-Battery modules type X-BESS 1000-2H with a total installed capacity of 1 MWh;
-Inverter units and transformer substations 16×630 kVA, 0.4/0.4 kV;
-BMS and HVAC systems for control, safety and optimal management;
-Integrated EMS system for charge and discharge management, monitoring and remote control of PV and SSE.

The project aims to ensure more efficient use of the electricity produced by the PV for own consumption, reduction of peak loads and electricity costs, as well as greater energy independence of the enterprise.
The investment is in line with the objectives of procedure BG16RFPR001-2.004 "Energy efficiency and use of energy from renewable sources in enterprises", as it is implemented in existing infrastructure and does not include new construction.
None

Notes:

Elements in light blue allow detailed view when selected
All amounts are in euro (EUR) / 1 EUR = 1,95583 BGN
The project is funded by the “Technical Assistance” Programme 2021–2027, co-financed by the European Union through the European Regional Development Fund, under project BG16RFTA001-1.003-0001 “Digital transformation in the management of EU funds” and by the “National Recovery and Resilience Plan”, under Investment C10.I11 “Ensuring an adequate information and administrative environment for the implementation of the Recovery and Resilience Plan”.