Saved trees
UMIS AND ITS USERS CONTRIBUTED TO SAVING 76 841 TREES
Български

Programme: Programme "Competitiveness and Innovation in Enterprises" 2021-2027

Planning region: All

Description

The project proposal of Velinov Holidays Ltd. is aimed at improving the company’s energy efficiency and reducing its carbon footprint through the implementation of modern energy-saving technologies. Within the scope of the project, three air-to-water heat pumps with a unit capacity of 16 kW will be installed, providing energy-efficient heating, cooling, and domestic hot water for the facility.

In addition, a photovoltaic power plant will be constructed with panels and an inverter with a total capacity of 20 kW, as well as an energy storage system consisting of 16 battery modules with a capacity of 5.12 kW each, or a total of 81.92 kW. For the efficient operation of the system, only one inverter is required to manage the generated and stored energy.

Through the implementation of these investments, the company will achieve a significant reduction in electricity costs, improve its energy independence, and contribute to the sustainable development of its tourism services in line with modern environmental standards.
None

Notes:

Elements in light blue allow detailed view when selected
All amounts are in euro (EUR) / 1 EUR = 1,95583 BGN
The project is financed by the Operational Programme "Technical Assistance" and co-financed by the European Union through the European Regional Development Fund.
In implementing the project № 0115-CCU-2.1 "Information system for management and monitoring of EU funds in 2014-2020 - UMIS 2020" (BG161PO002-2.1.01-0007-C0001).