Description

The project proposal of Velinov Holidays Ltd. is aimed at improving the company’s energy efficiency and reducing its carbon footprint through the implementation of modern energy-saving technologies. Within the scope of the project, three air-to-water heat pumps with a unit capacity of 16 kW will be installed, providing energy-efficient heating, cooling, and domestic hot water for the facility.

In addition, a photovoltaic power plant will be constructed with panels and an inverter with a total capacity of 20 kW, as well as an energy storage system consisting of 16 battery modules with a capacity of 5.12 kW each, or a total of 81.92 kW. For the efficient operation of the system, only one inverter is required to manage the generated and stored energy.

Through the implementation of these investments, the company will achieve a significant reduction in electricity costs, improve its energy independence, and contribute to the sustainable development of its tourism services in line with modern environmental standards.
None

Notes:

Elements in light blue allow detailed view when selected
All amounts are in euro (EUR) / 1 EUR = 1,95583 BGN
The project is funded by the “Technical Assistance” Programme 2021–2027, co-financed by the European Union through the European Regional Development Fund, under project BG16RFTA001-1.003-0001 “Digital transformation in the management of EU funds” and by the “National Recovery and Resilience Plan”, under Investment C10.I11 “Ensuring an adequate information and administrative environment for the implementation of the Recovery and Resilience Plan”.