Programme: Programme "Competitiveness and Innovation in Enterprises" 2021-2027

Planning region: All

Description

“Transtroi” JSC plans to implement an investment aimed at improving energy efficiency and the use of renewable energy sources through the installation of a photovoltaic system with inver abattery storage wi. The assets will be installed on the roof of the company’s hotel and will
The photovoltaic system will generate electricity from solar energy, designed in line with the roof characteristics and the hotel’s energy needs. The batteries will enable storage of the generated electricity during periods of low consumption and its use during peak demand, thus increasing self-sufficiency and
The activity covers the delivery, installation, and commissioning of the assets, including the construction of support structures, connection to the internal grid, configuration, and testing. A monitoring system will also be introduced, providing contin
The expected benefits include a substantial reduction of the hotel’s electricity costs, coverage of a significant share of consumption through in-house generation, optimization of the energy balance, and reduction of carbon emissions. The project will contribute to the sustainable development of “Transtroi” JSC, enhance its competitiveness, and support the achievement of European energy transition goal
The investment will be implemented in full compliance with the “Do No Significant Harm” princip
None

Notes:

Elements in light blue allow detailed view when selected
All amounts are in euro (EUR) / 1 EUR = 1,95583 BGN
The project is funded by the “Technical Assistance” Programme 2021–2027, co-financed by the European Union through the European Regional Development Fund, under project BG16RFTA001-1.003-0001 “Digital transformation in the management of EU funds” and by the “National Recovery and Resilience Plan”, under Investment C10.I11 “Ensuring an adequate information and administrative environment for the implementation of the Recovery and Resilience Plan”.