Saved trees
UMIS AND ITS USERS CONTRIBUTED TO SAVING 77 625 TREES
Български

Programme: Programme "Competitiveness and Innovation in Enterprises" 2021-2027

Planning region: All

Description

The project proposal envisages the replacement of an existing fluorescent lighting fixture with a new, energy-efficient LED lighting fixture. The aim is to improve the energy efficiency and sustainability of the lighting system through the use of modern LED technology with a power consumption of 33 W.
The expected luminous flux will ensure high illumination levels while significantly reducing energy consumption compared to traditional fluorescent fixtures. The color temperature is intended to provide neutral white light, suitable for work environments.
The new LED lighting fixture also features a long operational lifespan, which significantly reduces the need for maintenance and replacement.
The project is aligned with the objectives of energy efficiency and sustainable development, contributing to resource optimization and reducing environmental impact.
The implementation of the project will lead to a reduction in the company’s energy intensity,optimization of production processes, and a substantial decrease in greenhouse gasemissions. The measures are fully in line with national and European policies on energyefficiency and the use of renewable energy sources.Through this project, DARIMEX 98 Ltd. seeks to strengthen its competitiveness, reduce itsenergy costs, and contribute to the sustainable development of the industry in the region.
None

Notes:

Elements in light blue allow detailed view when selected
All amounts are in euro (EUR) / 1 EUR = 1,95583 BGN
The project is funded by the “Technical Assistance” Programme 2021–2027, co-financed by the European Union through the European Regional Development Fund, under project BG16RFTA001-1.003-0001 “Digital transformation in the management of EU funds” and by the “National Recovery and Resilience Plan”, under Investment C10.I11 “Ensuring an adequate information and administrative environment for the implementation of the Recovery and Resilience Plan”.