Saved trees
UMIS AND ITS USERS CONTRIBUTED TO SAVING 77 611 TREES
Български

Programme: Programme "Competitiveness and Innovation in Enterprises" 2021-2027

Planning region: All

Description

The project proposal envisages the construction of a photovoltaic power plant (PPP) with an installed capacity of 56 kW and an energy storage system with a capacity of 56 kWh, designed to cover the own electricity needs of Heil Konstruktor “ Ltd. - the company specializes in the construction of photovoltaic systems, electrical panels, charging stations for electric vehicles, video surveillance, cleaning and leveling of terrain, as well as providing rental equipment with an operator.
The installation will be installed on the roof of the company's commercial and production base in the city of Montana. The electricity produced will be used entirely for its own consumption, contributing to a significant reduction in electricity costs and limiting carbon emissions.
The system is expected to produce about 70,000 kWh of electricity per year, which will cover approximately 70–75% of the company's total energy consumption. This will lead to cost savings and a reduction in CO₂ emissions by about 50 tons per year.
The implementation The project will increase the energy efficiency, independence and sustainability of the company and will have a positive economic and environmental effect.
None

Notes:

Elements in light blue allow detailed view when selected
All amounts are in euro (EUR) / 1 EUR = 1,95583 BGN
The project is funded by the “Technical Assistance” Programme 2021–2027, co-financed by the European Union through the European Regional Development Fund, under project BG16RFTA001-1.003-0001 “Digital transformation in the management of EU funds” and by the “National Recovery and Resilience Plan”, under Investment C10.I11 “Ensuring an adequate information and administrative environment for the implementation of the Recovery and Resilience Plan”.