Saved trees
UMIS AND ITS USERS CONTRIBUTED TO SAVING 73 761 TREES
Български

Programme: Programme "Competitiveness and Innovation in Enterprises" 2021-2027

Planning region: All

Description

We plan to implement the investment in a separate facility in the city of Plovdiv, which houses the office of the company, which carries out accounting and tax activities. The building includes work spaces, a kitchenette and relaxation areas, with the main consumers of electricity being:
- 2 air conditioners for heating and cooling;
- kitchen equipment (refrigerator, oven, microwave, coffee machine, etc.);
- 10 computers and 2 multifunctional devices (copier/printer/scanner);
- treadmill and office lighting.
The total average annual electricity consumption for the office is about 15 MWh/year, and is expected to increase to 20 MWh/year, as this year the office was expanded and additional electrical appliances and office equipment were included.
It is planned to implement a Photovoltaic Power Plant (PVPP) with a nominal AC output power of 33.3 kW, mounted on the roof of the site, as well as Energy Storage Batteries, with a capacity consistent with the daily load of the office, allowing the accumulation of the produced energy and its use during the hours without sunlight.
The expected results and energy indicators are the following:
- Approximate annual electricity yield, with a specific yield for Southern Bulgaria - about ≈ 22.5 MWh/year. .
- Coverage of energy needs: with an annual consumption of 20 MWh, the PVPP will cover ≈ 100% of the site's consumption.
Thanks to the storage batteries, part of the excess energy will be accumulated and used effectively during the hours without sunlight, which will lead to maximum self-consumption and minimal dependence on external suppliers.
- Share of energy from renewable sources: ≈ 100% of the total annual consumption will be provided by RES.
We will also achieve a reduction in greenhouse gas emissions, the emissions saved are approximately 6.75 tCO₂e/year .
We also expect a reduction in electricity costs of 85–95%, depending on the share of self-consumption, battery capacity and fixed grid charges.
None

Notes:

System.Threading.Tasks.Task`1[Microsoft.AspNetCore.Html.HtmlString] Elements in light blue allow detailed view when selected
All amounts are in euro (EUR) / 1 EUR = 1,95583 BGN
The project is financed by the Operational Programme "Technical Assistance" and co-financed by the European Union through the European Regional Development Fund.
In implementing the project № 0115-CCU-2.1 "Information system for management and monitoring of EU funds in 2014-2020 - UMIS 2020" (BG161PO002-2.1.01-0007-C0001).
System.Threading.Tasks.Task`1[Microsoft.AspNetCore.Html.HtmlString]