The project of "City Stroyinvest" Ltd. envisages the implementation of energy efficiency measures in the company’s activities. The firm is an established construction enterprise with main economic activity under NACE 41.20 – “Construction of residential and non-residential buildings,” offering a wide range of construction and finishing services, including water supply and sewerage systems, electrical installations, high- and low-voltage networks, transformer stations, as well as modern solutions in dry construction and interior finishing. The company’s operations are associated with significant electricity consumption due to the continuous use of construction equipment, power tools, offices, and storage facilities. The project plans to install photovoltaic panels paired with inverters, along with local energy storage systems (batteries) integrated with inverters. The implementation of the investment will allow for: -covering a significant part of the company’s own electricity needs through renewable energy production; -efficient use and storage of the generated energy for consumption during peak hours; -reducing energy costs and dependence on the electricity distribution network; -substantially lowering carbon emissions and contributing to the objectives of the green transition; -increasing the company’s competitiveness through optimization of operating costs and ensuring more sustainable development. The project is in full compliance with the objectives of procedure BG16RFPR001-2.004 “Energy efficiency and use of energy from renewable sources in enterprises” and with the principle of “Do No Significant Harm” (DNSH).
None
