The project of “JUMBO – 2007” Ltd. aims to improve energy efficiency and increase the use of renewable energy sources in the company’s operations. The enterprise carries out wholesale trade in wood, construction materials, and sanitary equipment and operates its own warehouse and administrative base, which represents a major energy consumer due to the large building area and continuous need for heating and cooling. To reduce energy costs, increase sustainability, and lower the carbon footprint, the company plans to implement the following investment measures: Installation of roof insulation covering 500 sq.m to reduce heat losses and improve indoor comfort; Construction of a photovoltaic power plant with a capacity of 50 kWp for self-consumption; Installation of a local battery energy storage system to optimize the use of the generated electricity and improve energy independence. The implementation of the project will result in lower energy consumption, increased share of renewable energy in the company’s energy mix, reduced operational costs, and higher competitiveness. The investment fully complies with the objectives of procedure BG16RFPR001-2.004, supporting the green transition and the long-term sustainability of Bulgarian enterprises.
None
