The project aims to significantly improve the company’s energy efficiency through the implementation of high-performance technologies and the utilization of renewable energy sources. The main investment includes the construction of a 20 kW photovoltaic power plant (PVPP) combined with a 15 kW local energy storage system, enabling optimized self-consumption and reduced electricity costs. Additionally, the project foresees the replacement of existing transparent envelope structures (windows and doors) with new aluminum frames with thermal break, totaling 104 m², as well as the replacement of sectional industrial and solid exterior doors with a total area of 42 m², ensuring improved thermal insulation performance. The expected results include a significant reduction in specific energy consumption, lower greenhouse gas emissions, and an increased share of green energy in the company’s energy mix. The implementation of the project will enhance the company’s competitiveness by reducing energy costs, extending the lifespan of the building envelope, and ensuring compliance with European decarbonization policies.
None
