Programme: Programme "Competitiveness and Innovation in Enterprises" 2021-2027

Planning region: All

Description

The project proposal of “GT CAPITAL” Ltd. is focused on the acquisition of local energy storage systems – batteries with inverter – to be integrated into the company’s existing photovoltaic power plant, unlocking its full potential.
The integration of energy storage systems is essential to overcome several key challenges, namely the fact that a significant portion of the generated electricity remains unused, especially outside working hours. This leads to economic losses, inefficient load on the electrical installation, dependence on external energy suppliers, and lower environmental performance. These factors create a real need for implementing a storage system that enables accumulation and targeted use of energy during periods of high consumption.
The main objective of the project is to improve the energy efficiency of production processes through the implementation of an intelligent system for energy storage and management. This will ensure better balancing of energy flows, reduction of peak loads, and optimization of resource use. An additional goal is to achieve greater energy independence and operational sustainability for the enterprise.
The expected results include increased energy storage capacity, reduced electricity costs, lower carbon emissions, as well as improved predictability and stability of the production schedule.
The core project activities include: delivery and installation of batteries with inverter, integration with the existing photovoltaic system, commissioning, training of technical staff, and provision of regular maintenance via a BMS platform. All activities are aligned with the technical and administrative requirements of procedure BG16RFPR001-2.004 and are aimed at achieving tangible, measurable, and sustainable results.
None

Notes:

Elements in light blue allow detailed view when selected
All amounts are in euro (EUR) / 1 EUR = 1,95583 BGN
The project is financed by the Operational Programme "Technical Assistance" and co-financed by the European Union through the European Regional Development Fund.
In implementing the project № 0115-CCU-2.1 "Information system for management and monitoring of EU funds in 2014-2020 - UMIS 2020" (BG161PO002-2.1.01-0007-C0001).