Saved trees
UMIS AND ITS USERS CONTRIBUTED TO SAVING 77 611 TREES
Български

Programme: Programme "Competitiveness and Innovation in Enterprises" 2021-2027

Planning region: All

Description

“METAL – DIMITROV 59” EOOD operates the “TIR Parking & Restaurant – Vratsa” complex, comprising a secured truck parking area, restaurant, sanitary facilities (showers/toilets) and a convenience store. The site operates 24/7 and exhibits high, variable electrical loads (HVAC and ventilation, domestic hot water, kitchen appliances, refrigerated display cases/freezers, site lighting, ICT and pumps). Despite an existing PV installation for self-consumption, coverage is insufficient precisely during peak-load hours, sustaining high grid imports, costs, and exposure to price volatility. The project proposes an integrated package of energy-efficiency measures:
A photovoltaic power plant for self-consumption with a 30 kW (AC) inverter, configured for self-consumption priority and zero-export where required, including monitoring and protections (AC/DC, selectivity, SPDs). Two high-efficiency air-to-air heat pumps, each with 18.7 kW heating capacity, serving the restaurant/hall/sanitary blocks, replacing inefficient heating/cooling equipment and reducing peak demand during busy periods.
All measures are eligible under the List of Assets; components will be new and certified, meeting the minimum mandatory functionalities. The investment will be costed under the unit-cost methodology, with results-based disbursement (commissioning, protocols from a certified installer, photo/video evidence, meter/EMS logs).
Expected results and impacts:
Higher PV self-consumption and lower grid imports in working/peak hours;
Significant reduction of electricity costs and price-risk exposure;
More reliable power supply and improved customer comfort (thermal conditions, DHW, lighting, refrigeration);
Lower indirect CO₂ emissions, contributing to the green transition.
The project directly targets activity NACE 52.29 (H52 – other support activities for transportation), which is prioritized under the call, and delivers a measurable, energy, economic and environmental benefit for the complex.
None

Notes:

Elements in light blue allow detailed view when selected
All amounts are in euro (EUR) / 1 EUR = 1,95583 BGN
The project is funded by the “Technical Assistance” Programme 2021–2027, co-financed by the European Union through the European Regional Development Fund, under project BG16RFTA001-1.003-0001 “Digital transformation in the management of EU funds” and by the “National Recovery and Resilience Plan”, under Investment C10.I11 “Ensuring an adequate information and administrative environment for the implementation of the Recovery and Resilience Plan”.