Programme: Programme "Competitiveness and Innovation in Enterprises" 2021-2027

Planning region: All

Description

The project envisages the construction of a photovoltaic power plant from photovoltaic panels in combination with an inverter/s with a total minimum capacity of 20 kW and the installation of additional local energy storage facilities (battery/s) in combination with inverters with a total capacity of 100 kWh. The energy produced by the photovoltaic power plant will be stored in the battery and will be used for the applicant's own needs. The battery will fully utilize the electricity produced during the time of missing or low consumption - due to the specifics of consumption.
The assets are planned to be installed in a rented property used by the company. The photovoltaic modules will be on the roof of an existing production building.

The forecast envisages achieving over 90% annual savings of the electricity used by the grid.

The project supports ONLY an existing additional economic activity of the applicant. Beyond the official meaning of the presented code under the classifier of economic activities, this additional activity is engaged in the production of various types of power and low-current equipment/devices or accessories to it. This production is designed and assembled entirely in the only building used, and separate operations for cutting and mechanical processing of metal parts and electrical materials are also carried out.
None

Notes:

Elements in light blue allow detailed view when selected
All amounts are in euro (EUR) / 1 EUR = 1,95583 BGN
The project is funded by the “Technical Assistance” Programme 2021–2027, co-financed by the European Union through the European Regional Development Fund, under project BG16RFTA001-1.003-0001 “Digital transformation in the management of EU funds” and by the “National Recovery and Resilience Plan”, under Investment C10.I11 “Ensuring an adequate information and administrative environment for the implementation of the Recovery and Resilience Plan”.