Our company is engaged in the production and installation of advertising structures. We have sites all over Bulgaria, but the production hall is located in the city of Sofia. The company's building was new, and it is energy-intensive, difficult to heat and cool, and highly dependent on the electricity grid. We have a tremendous need for a photovoltaic system combined with a battery (PV + Storage) of 56.00 kW to store energy, due to the numerous power outages in the electricity grid in Bulgaria caused by insufficient grid capacity. At the same time, the price of electricity has risen drastically over the past few years as a result of the liberalization of the energy market.These factors have a negative impact on "EIS TM" Ltd.'s ability to offer products at competitive prices quickly and efficiently. To overcome the problems of energy dependence and expensive electricity, as well as to move towards climate neutrality, we need to build a photovoltaic system for our own consumption with local energy storage facilities (batteries) (PV power plant) of 56.00 kW at the workshop site. The photovoltaic installations will be built on the roof of the building, with their capacity aligned with peak energy consumption and sufficient to cover the basic needs for its operation. Our investment will contribute to achieving economic transformation by attaining energy independence, reducing overhead costs, and lowering the carbon footprint, leading to increased competitiveness of the company.
None
