The project proposal of MEGA TRANS 07 Ltd. involves the construction of a photovoltaic power plant (PV system) with an installed capacity of 56 kW and an energy storage system (battery) with a capacity of 56 kWh, designed to cover the company’s own electricity consumption.
The installation will be mounted on the roof of a building located in Montana, Industrial Zone, “Malo Pole”, where the company’s main operational base is situated, including a vehicle service facility, administrative and storage areas, and an in-house fuel station.
The implementation of the project will enable the company to produce approximately 70,000 kWh of renewable electricity annually, covering 70–75% of its total energy needs. This will result in annual electricity cost savings of about BGN 25,000–27,000 and a reduction of CO₂ emissions by approximately 50 tons per year.
The main objective of the project is to improve energy efficiency and reduce energy intensity through the introduction of a renewable energy source – solar power.
The project will contribute to increased energy independence, lower carbon footprint, enhanced competitiveness, and sustainable development of the company through the adoption of green technologies in the transport sector.
None

Notes:

System.Threading.Tasks.Task`1[Microsoft.AspNetCore.Html.HtmlString] Elements in light blue allow detailed view when selected
All amounts are in euro (EUR) / 1 EUR = 1,95583 BGN
The project is financed by the Operational Programme "Technical Assistance" and co-financed by the European Union through the European Regional Development Fund.
In implementing the project № 0115-CCU-2.1 "Information system for management and monitoring of EU funds in 2014-2020 - UMIS 2020" (BG161PO002-2.1.01-0007-C0001).
System.Threading.Tasks.Task`1[Microsoft.AspNetCore.Html.HtmlString]