Saved trees
UMIS AND ITS USERS CONTRIBUTED TO SAVING 77 611 TREES
Български

Programme: Programme "Competitiveness and Innovation in Enterprises" 2021-2027

Planning region: All

Description

The project proposal includes the supply and installation of technological equipment for 51.8kWp, photovoltaic system and 52kWh storage batteries.
114 high-efficiency photovoltaic modules with 1762mm x 1134mm x 30mm, unit weight about 21.5 kg, nominal power 455Wp will be used. Thus, the total installed power of the photovoltaic modules will be up to 51.8kWp.
To achieve the required generated power, the photovoltaic panels will be connected to a 50kW hybrid inverter, which will allow the storage of excess solar energy in a solar battery for independent use.
The maximum AC power will be 50kVA. 
Based on the consumption provided by the client of 105 MWh for the previous year, a battery group with a total capacity of 52kWh is planned, since the consumption is mainly in the daylight.
It is planned to install an AC panel, which has current and voltage protection. Current protection is provided by circuit breakers, and voltage protection is provided by an arrester.
The following are planned: delivery and installation of a supporting metal structure, photovoltaic panels, DC cables, inverter, DC and AC distribution boards (mainly photovoltaic distribution board), grounding system, energy storage battery.
The type of eligible financing that we have chosen is motivated in detail in item 16 of Appendix 4.1 of the application package / FPP including solar panels, inverters, batteries and other components necessary for the operation of the plant.
None

Notes:

Elements in light blue allow detailed view when selected
All amounts are in euro (EUR) / 1 EUR = 1,95583 BGN
The project is funded by the “Technical Assistance” Programme 2021–2027, co-financed by the European Union through the European Regional Development Fund, under project BG16RFTA001-1.003-0001 “Digital transformation in the management of EU funds” and by the “National Recovery and Resilience Plan”, under Investment C10.I11 “Ensuring an adequate information and administrative environment for the implementation of the Recovery and Resilience Plan”.