The project proposal of Galateya En OOD, a small enterprise in the sector of wholesale trade in other food products, provides for an investment in energy-efficient assets to modernize the energy infrastructure in a 2,000 m² warehouse located in Busmantsi district, Sofia, 6-ti Septemvri Str. The proposed activities include the procurement and installation of: Three air-to-water heat pumps, each with a thermal capacity of 30 kW (total 90 kW). They will replace traditional electric heaters, providing heating in winter and cooling in summer with heat recovery for refrigeration chambers. Local energy storage facilities: 60 kW installed capacity. The system will stabilize power supply during peak hours and reduce losses from interruptions. Photovoltaic panels with inverters: 30 kW installed capacity. Expected output: 40,000-45,000 kWh/year (at 1,400 sunshine hours in Sofia). Total investment amount: 169,212.90 BGN, of which 100,000 BGN (59.1%) is grant aid under the procedure. Own financing: 69,212.90 BGN. The project is in full compliance with horizontal policies (equality, non-discrimination, sustainable development, "do no significant harm"), with no affiliated enterprises engaged in similar activities (NACE Rev. 2 group 46) and no duplicating assets from other procedures (e.g., PRR BG16FFPR003-4.004 or "Support for Photovoltaic Systems"). Expected effects: Reduction in energy costs by 25-30% (savings of 18,000-22,000 BGN/year), CO₂ emissions by 35-40 tons/year, and interruptions by 95%. Improvement of the environmental profile, reduction of risks from sanctions under the EED Directive, and enhancement of competitiveness. The implementation of the project activities will accelerate the transition to a sustainable economy, stimulating regional development, improving energy efficiency, and increasing the use of energy from renewable sources for the company's own needs.17.9sHow can Grok help?
None
