Programme: Programme "Competitiveness and Innovation in Enterprises" 2021-2027

Planning region: All

Description

The project proposal of Impuls Co. Ltd. envisages the construction of a photovoltaic system with an energy storage system designed to cover the company's own electricity needs. The investment is being implemented at the company's site and aims to reduce dependence on external energy sources, increase energy efficiency, and optimize production costs.

The project includes the delivery, installation, and commissioning of a photovoltaic power plant with an installed capacity (AC) of 40 kW and an energy storage system with a capacity of 92.2 kWh.

The implementation of the project will enable the company to use the electricity produced entirely for its own needs, with an expected coverage of about 60% of its total annual consumption. The energy storage system will ensure a balance between instantaneous production and consumption, voltage stabilization, and uninterrupted power supply during peak loads, which will increase the reliability and sustainability of production processes.
None

Notes:

System.Threading.Tasks.Task`1[Microsoft.AspNetCore.Html.HtmlString] Elements in light blue allow detailed view when selected
All amounts are in euro (EUR) / 1 EUR = 1,95583 BGN
The project is financed by the Operational Programme "Technical Assistance" and co-financed by the European Union through the European Regional Development Fund.