The project proposal of "MK Engineering 2002" EOOD is aimed at increasing energy efficiency, reducing the carbon footprint and increasing the energy independence of the enterprise by integrating renewable energy sources and an energy storage system. The main need that the project addresses is the high level of electricity costs, dependence on external suppliers and fluctuations in electricity prices. This directly affects the production costs and long-term sustainability of the company.
The project envisages the delivery and installation of a photovoltaic power plant with an installed capacity of 65 kW, designed to cover the enterprise's own electricity consumption. In addition, an integrated energy storage system with an installed capacity of 65 kW will be built, including batteries and inverters, which will ensure optimal management of the energy produced and will allow its use when necessary, including at peak times or during reduced production.
The expected results of the project implementation include a significant reduction in electricity consumption from the grid, reduction of energy costs, increase of competitiveness and sustainable development of the company. Additionally, a reduction of carbon emissions will be achieved, which is in line with national and European policies for green transition and climate neutrality.
The project will contribute to improving the energy efficiency of "MK Engineering 2002" EOOD through specific investments in modern technologies for renewable energy and storage, while creating conditions for sustainable growth and higher resource efficiency.
None

Notes:

Elements in light blue allow detailed view when selected
All amounts are in euro (EUR) / 1 EUR = 1,95583 BGN
The project is funded by the “Technical Assistance” Programme 2021–2027, co-financed by the European Union through the European Regional Development Fund, under project BG16RFTA001-1.003-0001 “Digital transformation in the management of EU funds” and by the “National Recovery and Resilience Plan”, under Investment C10.I11 “Ensuring an adequate information and administrative environment for the implementation of the Recovery and Resilience Plan”.