The project envisages the construction of a PV power plant from PV panels in combination with an inverter/s with a total minimum capacity of 20 kW and the installation of additional local energy storage facilities (battery/s) in combination with inverters with a total capacity of 80 kWh. The energy produced by the photovoltaic power plant will be stored in the battery and will be used for the applicant's own needs. The battery will fully utilize the electricity produced during the time of missing or low consumption - due to the specifics of consumption. The company currently operates in rented premises. The assets are planned to be installed in a property owned by the company, where a new building is being built at an advanced stage, where it is planned to move all of the applicant's activities, including production, trade, administrative management of the company, etc. The construction is expected to be completed by the end of 2025. The photovoltaic modules are planned to be located on the roof of this newly built building. The building will be in use most probably before the possible signing of the Administrative contract. The forecast envisages achieving above 90% annual savings in the electricity used by the network compared to the current situation and over 60% overall together with the planned new power consuming equipment, which are currently not used due to the limitations in the rented space. The project supports ONLY existing and main economic activity of the applicant. Beyond the official meaning of the presented code according to the classifier of economic activities, the activity is engaged in the production and trade of goods used for roofing and/or roof drainage. About 40% of the commercial assortment are goods of other manufacturers, and the rest are own production. Own production is specialized in metal products, including gutters and downpipes, and accessories for them or elements for their fastening.
None