The project of “ET SPOLUKA – IVANOV – IVAN ANDONOV” aims to build a 55 kWp photovoltaic power plant integrated with a Battery Energy Storage System (BESS) and an Energy Management System (EMS) for self-consumption at the company’s site in Yambol, 30 Pirin Street. The investment targets a lasting reduction of electricity costs, mitigation of price volatility and improved energy efficiency through optimal use of renewable energy. The system will operate grid-connected, covering the major share of daytime demand; the batteries will shift loads from periods of higher tariffs/lower PV output, increasing the self-consumption ratio and reducing peak demand. The scope includes supply and installation of PV modules, a bidirectional inverter, BESS, mounting structures and cabling, protection and metering equipment, commissioning and staff training. The project will comply with the applicable regulations and the Call Guidelines; no excluded activities are envisaged and the intervention remains within the eligible scope. Expected results include higher energy autonomy for the repair service operations, lower specific grid consumption and greenhouse gas emissions, and a sustained improvement in the enterprise’s competitiveness.
None
