To improve the energy efficiency of the company, the following investments will be made: 1. Photovoltaic power plant (PVPP) with a panel capacity of 30 kWp, a three-phase inverter and a battery capacity for storing electricity of 60 kWh - 1 pc.; 2. Compressed air compressor together with a compressed air tank with inverter control with a dryer with a capacity of 4 kW - 1 pc.; 3. Replacement of doors at a technical inspection point - Sectional industrial doors/external solid doors 2 pcs.*9.6 m2; 4. Replacement of garage doors at a service station - Sectional industrial doors/external solid doors 3 pcs.*7.5 m2; 5. Air/water heat pump - 30 kW - 1 pc.; 6. Solar systems for hot water and domestic hot water supply with flat solar collectors 10 m2 - 1 pc.