Programme: Programme "Competitiveness and Innovation in Enterprises" 2021-2027

Planning region: All

Description

To improve the energy efficiency of the company, the following investments will be made:
1. Photovoltaic power plant (PVPP) with a panel capacity of 30 kWp, a three-phase inverter and a battery capacity for storing electricity of 60 kWh - 1 pc.;
2. Compressed air compressor together with a compressed air tank with inverter control with a dryer with a capacity of 4 kW - 1 pc.;
3. Replacement of doors at a technical inspection point - Sectional industrial doors/external solid doors 2 pcs.*9.6 m2;
4. Replacement of garage doors at a service station - Sectional industrial doors/external solid doors 3 pcs.*7.5 m2;
5. Air/water heat pump - 30 kW - 1 pc.;
6. Solar systems for hot water and domestic hot water supply with flat solar collectors 10 m2 - 1 pc.
None

Notes:

System.Threading.Tasks.Task`1[Microsoft.AspNetCore.Html.HtmlString] Elements in light blue allow detailed view when selected
All amounts are in euro (EUR) / 1 EUR = 1,95583 BGN
The project is financed by the Operational Programme "Technical Assistance" and co-financed by the European Union through the European Regional Development Fund.
In implementing the project № 0115-CCU-2.1 "Information system for management and monitoring of EU funds in 2014-2020 - UMIS 2020" (BG161PO002-2.1.01-0007-C0001).
System.Threading.Tasks.Task`1[Microsoft.AspNetCore.Html.HtmlString]