The project proposal of “Velina” Ltd. aims to improve energy efficiency and reduce energy consumption at Hotel “Kashmir” in Velingrad through the implementation of a high-efficiency heat pump system utilizing renewable energy sources. The project includes the supply, installation, and commissioning of the equipment, along with complementary activities to integrate the system into the existing energy infrastructure of the facility. Its implementation will result in measurable energy savings, reduced greenhouse gas emissions, and increased competitiveness of the enterprise, in line with the objectives of procedure BG16RFPR001-2.004 under the Programme “Competitiveness and Innovation in Enterprises 2021–2027.”
None
