Saved trees
UMIS AND ITS USERS CONTRIBUTED TO SAVING 77 624 TREES
Български

Programme: Programme "Competitiveness and Innovation in Enterprises" 2021-2027

Planning region: All

Description

The project of ALDO LTD aims to establish a photovoltaic power plant (PVPP) for the company’s own energy consumption, with the goal of increasing energy efficiency and utilizing renewable energy sources. The main objective is to reduce electricity costs, optimize the company’s energy mix, and decrease its carbon footprint.

The project includes the supply and installation of a PVPP 40 kw combined with integrated local energy storage systems 40 kw, enabling optimal management of the produced electricity and minimizing reliance on the external grid. The system will be equipped with monitoring and control solutions to ensure efficient use of generated energy. The PVPP capacity will be matched to the company’s current annual electricity consumption to cover all on-site energy needs. The company will also replace 156 lighting fixtures – 50 W linear luminaires, in order to improve energy efficiency, lighting quality, and working conditions in the production facilities.

Implementation of the project will lead to significant energy cost savings, enhanced business sustainability, and alignment with European policies on circular economy and energy efficiency. The project fully complies with the requirements of the Operational Program “Competitiveness and Innovation in Enterprises” 2021–2027, procedure BG16RFPR001-2.004.
None

Notes:

Elements in light blue allow detailed view when selected
All amounts are in euro (EUR) / 1 EUR = 1,95583 BGN
The project is funded by the “Technical Assistance” Programme 2021–2027, co-financed by the European Union through the European Regional Development Fund, under project BG16RFTA001-1.003-0001 “Digital transformation in the management of EU funds” and by the “National Recovery and Resilience Plan”, under Investment C10.I11 “Ensuring an adequate information and administrative environment for the implementation of the Recovery and Resilience Plan”.