Programme: Programme "Competitiveness and Innovation in Enterprises" 2021-2027

Planning region: All

Description

The project proposes the installation of a 55 kW rooftop photovoltaic plant for self-consumption at “Graniti Leventi” EOOD., a stone processing company in Sofia, Bulgaria. The investment addresses electricity-intensive cutting and polishing operations and aims to reduce purchased electricity, stabilize energy costs and improve operational reliability during day shifts. The system will comply with the minimum technical criteria: PV modules with ≥20% efficiency, ≥12-year product warranty, ≤3% first-year degradation and ≤0.6%/year linear degradation for monofacial or ≤0.5%/year for bifacial modules over ≥25 years; inverters with European weighted efficiency ≥96%, THD ≤5%, DC input ≤1500 V, monitoring and ≥10-year warranty; an export-limiting device to ensure zero-feed-in operation when required; mounting structures of low-corrosion materials. Future-ready provision for battery storage includes batteries operating at 0–45 °C, ≥5-year product warranty and ≥10-year performance warranty, with storage inverters warranted for ≥10 years. The project is consistent with the objectives of the CIEP Programme Procedure BG16RFPR001-2.004 to improve energy efficiency and increase the share of renewable energy used for own consumption in enterprises.
None

Notes:

Elements in light blue allow detailed view when selected
All amounts are in euro (EUR) / 1 EUR = 1,95583 BGN
The project is funded by the “Technical Assistance” Programme 2021–2027, co-financed by the European Union through the European Regional Development Fund, under project BG16RFTA001-1.003-0001 “Digital transformation in the management of EU funds” and by the “National Recovery and Resilience Plan”, under Investment C10.I11 “Ensuring an adequate information and administrative environment for the implementation of the Recovery and Resilience Plan”.