The project proposal concerns the supply and installation of technological equipment for a photovoltaic power plant for the production of electricity for the company "MIL-83" EOOD, with the following parameters - 61.18kWp photovoltaic system and 61.4kWh batteries for energy storage. Highly efficient photovoltaic modules with a unit weight of about 21kg, a nominal power of 460Wp and a total installed power of the photovoltaic modules - up to 61.18kWp will be used.
To achieve the required generated power, the photovoltaic panels will be connected to a three-phase inverter of 60kW. The maximum AC power will be 60kVA. This inverter is hybrid. The hybrid inverter is an intelligent device that allows excess solar energy to be stored in a battery and used when necessary.
Based on the estimated consumption of 100MWh provided by the client for the previous year, a battery group with a total capacity of 61.4kWh is planned.
The system will be built on a solid building with a LT sheet metal roof, and the photovoltaic panels will be attached using aluminum rails.
It is planned to install an alternating current and direct current (AC/DC) panel, which has current and voltage protection. Current protection will be provided by circuit breakers, and voltage protection will be provided by an arrester.
The type of permissible financing that we have chosen is motivated in detail in item 16 of Appendix 4.1 of the application package / FPP including solar panels, inverters, batteries and other components necessary for the operation of the plant.
"MIL-83 OOD" meets the conditions for financing the procedure and collects 42 points according to the criteria for technical and financial evaluation of Appendix 5.
None

Notes:

System.Threading.Tasks.Task`1[Microsoft.AspNetCore.Html.HtmlString] Elements in light blue allow detailed view when selected
All amounts are in euro (EUR) / 1 EUR = 1,95583 BGN
The project is financed by the Operational Programme "Technical Assistance" and co-financed by the European Union through the European Regional Development Fund.
In implementing the project № 0115-CCU-2.1 "Information system for management and monitoring of EU funds in 2014-2020 - UMIS 2020" (BG161PO002-2.1.01-0007-C0001).