Saved trees
UMIS AND ITS USERS CONTRIBUTED TO SAVING 77 611 TREES
Български

Programme: Programme "Competitiveness and Innovation in Enterprises" 2021-2027

Planning region: All

Description

The present project of the construction company PLANEX INFRASTRUCTURE Ltd. aims to enhance the energy efficiency, sustainability, and competitiveness of the enterprise through the installation of a local energy storage facility – a battery system combined with an inverter with a capacity of 100 kW. The investment will be integrated into the company’s existing electrical infrastructure and will support the more efficient use of energy produced from renewable sources (a photovoltaic system) for self-consumption.

By implementing the battery storage system, the company will achieve optimization of energy loads, balancing of peak power demands, and reduction of electricity costs. This will enable better management of energy resources within the company’s operations, including during the use of construction equipment, as well as in storage and administrative facilities. The project will contribute to reducing carbon emissions, increasing energy independence, and promoting the sustainable development of the enterprise.

The initiative is fully aligned with the objectives of the Programme “Competitiveness and Innovations in Enterprises” 2021–2027, Priority Axis “Circular Economy”, and supports the transition towards improved energy efficiency and the utilization of renewable energy sources. The implementation of the project will have a direct positive impact on the production and construction capacity of PLANEX INFRASTRUCTURE Ltd., creating conditions for sustainable growth, lower energy costs, and a reduced environmental footprint of the company’s activities.
None

Notes:

Elements in light blue allow detailed view when selected
All amounts are in euro (EUR) / 1 EUR = 1,95583 BGN
The project is funded by the “Technical Assistance” Programme 2021–2027, co-financed by the European Union through the European Regional Development Fund, under project BG16RFTA001-1.003-0001 “Digital transformation in the management of EU funds” and by the “National Recovery and Resilience Plan”, under Investment C10.I11 “Ensuring an adequate information and administrative environment for the implementation of the Recovery and Resilience Plan”.