ENEV Ltd. is a manufacturer of metal and aluminum joinery and is mainly engaged in commercial activities. The project proposal concerns Improving the energy efficiency of ENEV OOD through: 1. Supply of air-to-air heat pumps 1.1. with a capacity of 17 kW- 3 units 1.2. with a capacity of 14 kW- 1 unit 2. ENERGY-EFFICIENT INSULATION SYSTEMS IN BUILDINGS 2.1..Thermal insulation of walls with Sandwich panels with thermal insulation - 180 m2 2.2. Thermal insulation of the roof with Sandwich panels with thermal insulation - 210 m2 2.3. Replacement of joinery by installing external windows and doors with aluminum frames with a thermal break - 60 m2 The expected results of the project are expressed in improving energy efficiency and improving the microclimate of buildings for the production, installation and storage of metal joinery and components, which will contribute to increasing competitiveness and reducing energy costs of the company
None
