Programme: Programme "Competitiveness and Innovation in Enterprises" 2021-2027

Planning region: All

Description

This project proposal is aimed at implementing measures to improve energy efficiency in the production building of Delfos Design - a company for design, manufacture and assembly of furniture. The project activities include the supply, installation and commissioning of two modern air-to-water heat pumps (respectively 170 kW and 130 kW heating capacity), which will fully solve the need for heating and air conditioning of the building.
With the help of this project and the acquisition and commissioning of a new heat pump system for heating and cooling, Delfos Design will be able to significantly reduce its energy consumption, and hence its energy consumption costs.
The implementation of the envisaged measures will also have a positive effect on the environment, as it will reduce the annual
consumption of primary non-renewable energy (in the case of natural gas) and reduce greenhouse gas emissions (t/CO2 eq.). 
The implementation of all project activities will comply with the "no harm principle" (2021/C58/01 within the meaning of Article 17 of Regulation (EU) 2020/852.
None

Notes:

Elements in light blue allow detailed view when selected
All amounts are in euro (EUR) / 1 EUR = 1,95583 BGN
The project is financed by the Operational Programme "Technical Assistance" and co-financed by the European Union through the European Regional Development Fund.
In implementing the project № 0115-CCU-2.1 "Information system for management and monitoring of EU funds in 2014-2020 - UMIS 2020" (BG161PO002-2.1.01-0007-C0001).