The project proposal is aimed at increasing the energy efficiency of “Malki Prikazki”/MP/, through the installation and commissioning of photovoltaic panels combined with an inverter with a capacity of 20 kW and local energy storage facilities (batteries) combined with an inverter with a capacity of 45 kW. The project also foresees the purchase of a two-stage (heating/cooling) climate chamber with humidity recuperation and a capacity of 4000 m³/h. The company operates restaurants and an event hall under the brands MP and MP– The Hall, both established venues for family celebrations, children’s birthdays, and various events. The electricity generated by the photovoltaic system under the project will be used exclusively for the company’s own consumption, related to its main economic activity – 93.29 “Other amusement and recreation activities”. In the context of rising electricity prices and instability in energy markets, reducing energy costs has become a key factor for the company’s long-term sustainability. Through the implementation of the project,MP will improve its energy efficiency in several key aspects: Significant reduction of current operating costs, by replacing purchased electricity with renewable energy produced on-site; Continuity of power supply, including during grid interruptions, ensured by the integration of smart inverters and battery storage systems. Provision of optimal temperature and humidity levels, as well as a constant flow of fresh, filtered air, which is critically important for the health and comfort of children. The target group of the project is MP, a micro-enterprise aiming to modernize and optimize its energy efficiency, reduce its energy load, and achieve greater cost sustainability. All project activities will be implemented in compliance with the horizontal principles under Art. 9 of Reg. (EU) No. 2021/1060, including adherence to the “Do No Significant Harm” principle to ensure no significant negative environmental impact.
None
