“Phoenix Trans Sped” Ltd. is a company operating in the freight road transport sector and maintaining a significant fleet of trucks, tractors, and specialized vehicles. The maintenance and servicing of the fleet are carried out in its own repair base, where electricity costs for heating, ventilation, and powering the repair and technological equipment represent a substantial share of the company’s overall expenditure balance. The project proposal aims to improve energy efficiency and reduce energy dependency through the implementation of three air-to-air heat pumps with a capacity of 16 kW each, as well as the construction of a 30 kW photovoltaic system for self-consumption, combined with local energy storage facilities with a capacity covering the installed power of the newly built photovoltaic system. The investment will result in lower electricity costs, optimized energy consumption, and a reduction of the company’s carbon footprint. Through this project, “Phoenix Trans Sped” Ltd. will achieve higher energy efficiency, greater resilience to energy market fluctuations, and long-term competitiveness in the international transport market, in line with national and European goals for the energy transition and climate neutrality. The investment is aligned with the principle of “Do No Significant Harm” to the environment and supports the achievement of national energy efficiency objectives. The project proposal is also in line with the principles of equality and equal opportunities for all. As a result of the project’s implementation, “Phoenix Trans Sped” Ltd. will achieve significant energy savings, enhance its competitiveness, and ensure conditions for long-term sustainable growth.
None
