Programme: Programme "Competitiveness and Innovation in Enterprises" 2021-2027

Planning region: All

Description

Main Activities of "Prista Stone" Ltd Include Laying External and Internal Claddings and Floorings Made of Granite, Marble, Limestone, Travertine, Technical Stone, and Other Materials. The Company's Product Portfolio Currently Includes:
- Execution of internal and external staircase floorings made of granite, marble, and limestone.
- Fabrication of claddings for kitchen countertops, bathroom countertops.
- Fabrication of claddings for fireplaces.
- Laying decorations and execution of mosaics in various designs and from different materials.
The machines operated by the company are highly energy-intensive, which ensures high energy consumption for production needs and consequently, a high cost of the final product. To ensure a chance for sustainable development under conditions of continuously rising raw material and energy carrier prices, the company must limit its operating costs, including energy expenditure.
To ensure the energy independence of the enterprise and reduce energy consumption for production needs, we plan to install a photovoltaic power plant with a capacity of 50 kW, combined with a local storage facility - a battery with a capacity of 100 kWh. The power plant will be installed on the roof space of the company's own production building, and the energy produced by the system will be entirely intended for its own needs.
The project will be implemented in the city of Ruse within 12 months.
None

Notes:

Elements in light blue allow detailed view when selected
All amounts are in euro (EUR) / 1 EUR = 1,95583 BGN
The project is funded by the “Technical Assistance” Programme 2021–2027, co-financed by the European Union through the European Regional Development Fund, under project BG16RFTA001-1.003-0001 “Digital transformation in the management of EU funds” and by the “National Recovery and Resilience Plan”, under Investment C10.I11 “Ensuring an adequate information and administrative environment for the implementation of the Recovery and Resilience Plan”.