Programme: Programme "Competitiveness and Innovation in Enterprises" 2021-2027

Planning region: All

Description

Optimization of energy consumption and improvement of competitiveness in TEMPO 2 OOD will be achieved through investment in a screw compressor, a vertical air receiver for compressed air and an energy-saving freon dryer.
The screw compressor provides:
-Higher air compression efficiency compared to traditional piston compressors.
-Frequency control (VSD) allows adaptation of the operating speed to the actual load of the concrete units, avoiding unnecessary electricity consumption at partial load.
-Reduction of stops and failures - stable operation of the compressor ensures continuity of the production process, which increases efficiency and reduces losses.
Vertical air receiver:
-Buffers and stabilizes the pressure in the pneumatic network, ensuring a continuous supply of compressed air to all concrete units.
-Covers consumption peaks without additional load on the compressor, which reduces frequent starts and stops and leads to energy savings.
-Reduces wear on pneumatic mechanisms and air leaks, which also optimizes electricity consumption.
Energy-saving freon dryer:
-Removes moisture from the air through adaptive cooling and regulation of the cooling cycle according to the actual flow rate.
-Protects pneumatic valves, cylinders and dispensers from corrosion and freezing, which reduces emergency stops and repairs.
-Reduces the dryer's electricity consumption by 20–40% compared to standard models, which further optimizes overall energy consumption.
None

Notes:

Elements in light blue allow detailed view when selected
All amounts are in euro (EUR) / 1 EUR = 1,95583 BGN
The project is funded by the “Technical Assistance” Programme 2021–2027, co-financed by the European Union through the European Regional Development Fund, under project BG16RFTA001-1.003-0001 “Digital transformation in the management of EU funds” and by the “National Recovery and Resilience Plan”, under Investment C10.I11 “Ensuring an adequate information and administrative environment for the implementation of the Recovery and Resilience Plan”.