The project proposal of “Valbis” Ltd. is aimed at increasing the energy efficiency of its warehouse facility through the implementation of integrated energy-saving measures. The planned activities include the installation of two high-efficiency heat pumps, which will reduce energy consumption and carbon emissions. In addition, external thermal insulation of the building with EPS panels will be carried out to improve heat retention and minimize thermal losses. The project also foresees the replacement of the old windows and doors with new energy-efficient joinery, ensuring higher levels of thermal and sound insulation. The implementation of these measures will lead to optimized energy costs, extended building life cycle, and improved working conditions. The project is in line with national and European priorities for sustainable development and the reduction of energy consumption in enterprises.
None
