Description

The project proposal is aimed at increasing energy efficiency and the use of renewable energy sources in the activities of the enterprise, which carries out domestic and international road transport, forwarding, as well as wholesale and retail trade.
The implementation of the investment aims to reduce the energy intensity of the operated buildings and facilities, limit energy losses and reduce energy costs, accompanied by a sustainable reduction in carbon emissions.

The project includes the implementation of the following energy-saving and sustainable measures:

- Installation of thermal insulation systems on roof, external walls and floor structures;

- Replacement of windows and doors with new PVC joinery and sectional industrial doors with high insulation performance;

- Construction of a photovoltaic power plant (PVPP) for own consumption.

The implementation of the project will contribute to modernizing the energy infrastructure of the enterprise, increasing its competitiveness and sustainability, as well as reducing the negative impact on the environment in accordance with the principles of the European Green Deal.
None

Notes:

Elements in light blue allow detailed view when selected
All amounts are in euro (EUR) / 1 EUR = 1,95583 BGN
The project is financed by the Operational Programme "Technical Assistance" and co-financed by the European Union through the European Regional Development Fund.
In implementing the project № 0115-CCU-2.1 "Information system for management and monitoring of EU funds in 2014-2020 - UMIS 2020" (BG161PO002-2.1.01-0007-C0001).