The project of "Iva - MM 2012" Ltd. envisages the construction of a photovoltaic power plant (PVPP) with an installed capacity of up to 50 kWp, designed to cover the company's own energy needs. The investment includes the delivery, installation and commissioning of photovoltaic panels, inverters, metal structures, cable routes and protective elements, as well as connection to the internal electrical installation. The company operates in the field of wholesale trade in timber, construction materials and sanitary equipment (NACE 46.73). The activities are intensive consumers of electricity due to the operation of machinery, tools and equipment, as well as the need to maintain warehouse and production premises. Through the implementation of the project, the company aims to reduce its dependence on external electricity suppliers, optimize its production costs and increase its energy efficiency. The plant is expected to provide over 60% of the annual electricity consumption, contributing to a significant reduction in carbon emissions and building a sustainable, ecological and competitive business environment. The project is in line with national and European priorities for green transformation and promotion of production from renewable energy sources.
None
