Saved trees
UMIS AND ITS USERS CONTRIBUTED TO SAVING 77 611 TREES
Български

Programme: Programme "Competitiveness and Innovation in Enterprises" 2021-2027

Planning region: All

Description

Megainvest - hold Ltd., a road construction and winter road maintenance company, proposes a rooftop 100 kW photovoltaic system on its equipment repair hall, combined with 35 kW local energy storage and dedicated inverters, an energy management and monitoring platform, and zero-export capability where required by the grid operator. The intervention addresses high and volatile electricity costs, operational risks from power quality issues, and the need for assured readiness of specialized machinery during the winter season. The PV modules will have efficiency ≥ 20%, a product warranty ≥ 12 years, first-year degradation ≤ 3%, and linear degradation guarantees of ≤ 0.6% per year for monofacial modules or ≤ 0.5% per year for bifacial modules for at least 25 years. Inverters will meet European weighted efficiency ≥ 96%, THD ≤ 5%, DC string voltage ≤ 1500 VDC, and product warranty ≥ 10 years, and will provide data logging of production and use. The storage system will operate at ambient 0–45°C, with product warranty ≥ 5 years, performance warranty ≥ 10 years, and storage inverters with product warranty ≥ 10 years. The project will improve reliability of power supply for welding, lifting and diagnostic equipment, reduce unplanned downtime, enhance availability of the machinery fleet and decrease indirect emissions associated with purchased electricity, while complying with applicable safety and grid requirements.
None

Notes:

Elements in light blue allow detailed view when selected
All amounts are in euro (EUR) / 1 EUR = 1,95583 BGN
The project is funded by the “Technical Assistance” Programme 2021–2027, co-financed by the European Union through the European Regional Development Fund, under project BG16RFTA001-1.003-0001 “Digital transformation in the management of EU funds” and by the “National Recovery and Resilience Plan”, under Investment C10.I11 “Ensuring an adequate information and administrative environment for the implementation of the Recovery and Resilience Plan”.