Description

The current project consists of the supply and installation of a battery with a capacity of 107 kWh in combination with one inverter with a nominal power of 50 kW. The local energy storage facility with a capacity of 107 kWh in combination with an inverter with a nominal power of 50 kW will be added to the existing photovoltaic power plant for self-consumption that we own and which has a total installed maximum power of 30 kWp. The photovoltaic power plant we own is located in the town of Dupnitsa, 38 Samokovsko Shosse Street, Reg. No. 87727.208156. The battery with the inverter will be mounted on the roof of a movable facility. An integral part of the total investment will be the existing project documentation - Design Solution - Structural Part and Design Solution - Electrical Part with drawings and installation instructions.
None

Notes:

System.Threading.Tasks.Task`1[Microsoft.AspNetCore.Html.HtmlString] Elements in light blue allow detailed view when selected
All amounts are in euro (EUR) / 1 EUR = 1,95583 BGN
The project is financed by the Operational Programme "Technical Assistance" and co-financed by the European Union through the European Regional Development Fund.
In implementing the project № 0115-CCU-2.1 "Information system for management and monitoring of EU funds in 2014-2020 - UMIS 2020" (BG161PO002-2.1.01-0007-C0001).