The project proposal of "Hit Electronics" aims to improve the company’s energy efficiency by implementing construction and technical measures to reduce heat losses and optimize energy consumption. The investment includes the installation of thermal insulation systems for external walls with a total area of 830 sq.m, which will significantly reduce heat losses through the building envelope. In addition, 5 sectional industrial/external solid doors will be installed – 4 with a size of 3.36 sq.m and 1 with a size of 2.21 sq.m, ensuring better insulation and minimizing energy losses in areas with intensive use. The project also foresees the delivery and installation of 3 air-to-air heat pumps with a thermal capacity of 13 kW each, replacing outdated and energy-intensive heating and cooling systems. The new equipment will provide an efficient and environmentally friendly solution for maintaining an optimal indoor climate, combining high performance with lower electricity consumption. The implementation of the project will result in: • a substantial reduction in energy costs, through limiting heat losses and introducing efficient heating technologies; • a reduction of carbon emissions, thanks to lower energy consumption from non-renewable sources; • improved working and commercial environment, by ensuring a better indoor climate; • sustainable business development, in line with national and European goals for energy efficiency and environmentally friendly economic activity. The planned measures are fully consistent with the objectives of procedure BG16RFPR001-2.004 – improving energy efficiency and reducing the negative impact on the environment.
None
