Description

The project proposal of “Mont Trans” Ltd. aims to build a photovoltaic power plant (PV plant) with an installed capacity of 56 kW and a battery storage system with a capacity of 56 kWh, designed to meet the company’s own electricity needs.
The investment will be implemented at the company’s base in Montana, 17 Diana Street, where the administrative offices, service facilities, and garages are located. The system will include photovoltaic panels, inverters, a control unit, a battery storage system, and all necessary safety and monitoring equipment.
“Mont Trans” Ltd. specializes in transportation and logistics of oversized cargo across Bulgaria and Europe, operating with a modern vehicle fleet and advanced infrastructure, which requires a significant amount of electricity for daily operations.
The electricity generated by the PV plant will be used entirely for self-consumption, primarily for lighting, equipment, and administrative needs. The installation is expected to produce approximately 70,000 kWh of electricity annually, leading to annual energy cost savings o and a reduction of CO₂ emissions by about 50 tons per year.
The project will contribute to:
- Improving the company’s energy efficiency and independence;
- Rreducing operational costs and increasing competitiveness;
- Implementing sustainable, environmentally friendly energy solutions.
None

Notes:

Elements in light blue allow detailed view when selected
All amounts are in euro (EUR) / 1 EUR = 1,95583 BGN
The project is funded by the “Technical Assistance” Programme 2021–2027, co-financed by the European Union through the European Regional Development Fund, under project BG16RFTA001-1.003-0001 “Digital transformation in the management of EU funds” and by the “National Recovery and Resilience Plan”, under Investment C10.I11 “Ensuring an adequate information and administrative environment for the implementation of the Recovery and Resilience Plan”.