The project of AM – TREYDING Ltd. aims to increase the energy efficiency and sustainability of the company’s service facility in the city of Montana through the implementation of high-performance technologies for energy production, storage, and efficient use. The main objective is to reduce electricity consumption from the external grid, optimize operational costs, and lower the company’s carbon footprint. The investment includes the following main measures: • Photovoltaic power plant (PV system) combined with an energy storage battery system with an installed capacity of 15 kW. The system will generate electricity for self-consumption, while the batteries will store the produced energy for later use, ensuring higher energy independence and stable supply during off-peak hours. • Energy-efficient lighting – linear LED luminaires: 105 units of 46 W, 20 units of 81 W, and 12 units of 58 W, replacing the existing conventional fixtures. The new LED lighting will significantly reduce energy consumption and improve visibility and workplace safety. • Compressor for compressed air with inverter control and air dryer with a nominal power of 7.5 kW, providing energy-efficient operation of pneumatic systems within the service facility. • Air receiver (reservoir) with a capacity of 500 liters, ensuring stable air pressure and optimal performance of the compressor system. The implementation of the project will lead to a significant reduction in total energy consumption and dependence on externally supplied electricity, lower operational costs, and improved energy stability and environmental performance. The integration of a photovoltaic installation with battery storage and energy-efficient technologies will contribute to the modernization and sustainable development of the company in line with the objectives of the European Green Transition.
None
