ANGO-KLIMA Ltd. was established in 2008, with NACE code 43.22 – Construction of water supply, sewerage, heating, and air-conditioning systems. The company offers a wide range of professional services in the fields of heating, ventilation, air conditioning, and the construction of gas installations. In recent years, due to the growing demand for energy-efficient solutions and the expansion of operations, the overall electricity consumption of the enterprise has increased. This has led to the need for measures aimed at enhancing energy independence, optimizing operating costs, and reducing the company’s carbon footprint. In this regard, under the current procedure, ANGO-KLIMA Ltd. is applying for the construction of a photovoltaic power plant with an installed capacity of 17.34 kWp, in accordance with Annexes 4.1 and 4.2 of the Guidelines for Applicants. The system is intended to cover part of the company’s own electricity consumption. The generation of electricity from a renewable source will lead to reduced energy costs, increased energy security, improved environmental performance, and enhanced competitiveness of the company. The support for energy-efficient equipment and the use of renewable energy for own needs, through the installation of a PVPP, will help ANGO-KLIMA Ltd. maintain its competitiveness and continue with its investment plans. The implementation of this investment, aimed at increasing energy efficiency and integrating renewable energy technologies into the company’s operations, is an important step toward achieving sustainable development. It will also contribute to the achievement of the cumulative national energy savings target for the period 2021–2030, as set out in the Integrated Energy and Climate Plan of Bulgaria. The investments under this project will be fully aligned with the “Do No Significant Harm” principle and the objective of achieving climate resilience, thereby contributing to the green transition of the company’s operations.
None
