Saved trees
UMIS AND ITS USERS CONTRIBUTED TO SAVING 77 624 TREES
Български

Programme: Programme "Competitiveness and Innovation in Enterprises" 2021-2027

Planning region: All

Description

The project proposal of Onitel EOOD is aimed at increasing competitiveness by building its own photovoltaic power plant with a capacity of 18 kW and an energy storage system with 18 kW batteries. The main goal is to reduce electricity costs, ensure higher energy independence and sustainability of production, as well as achieve better financial results and stronger market positions. The project includes the supply and installation of photovoltaic panels, an inverter, mounting structures, a control system and energy storage batteries, which will allow the accumulation of electricity and its use during periods of higher consumption. The expected annual production is about 22,000  kWh, which will be used for its own consumption, and the surplus will be stored in the battery system for the night operation of the servers in the office, which are in continuous mode. The economic benefits are expressed in a significant reduction in energy costs, optimization of the production process and an increase in EBITDA. The environmental effects include reducing carbon emissions and contributing to a green and sustainable economy in accordance with ESG requirements. The project will be implemented within 12 months through stages of design, delivery, installation, commissioning and staff training. The implementation will ensure a stable and efficient energy environment, greater predictability in operating costs and lasting competitive advantages for Onitel EOOD.
None

Notes:

Elements in light blue allow detailed view when selected
All amounts are in euro (EUR) / 1 EUR = 1,95583 BGN
The project is funded by the “Technical Assistance” Programme 2021–2027, co-financed by the European Union through the European Regional Development Fund, under project BG16RFTA001-1.003-0001 “Digital transformation in the management of EU funds” and by the “National Recovery and Resilience Plan”, under Investment C10.I11 “Ensuring an adequate information and administrative environment for the implementation of the Recovery and Resilience Plan”.