Indicators
| Indicator |
Measure Unit |
Base Value |
Target amount |
Reached amount |
| 1. Technical conditions enabled for the integration of new 2 500 MW production capacity from renewable sources (wind and solar) into the electricity system |
MW |
1 842.00
|
4 342.00
|
3 090.00
|
| 2. Signed contracts or the commencement of works for the upgrade of the national transmission systems |
|
No |
No |
No |
| 3. Increase of net cross-border transmission capacity by 600 MW |
MW |
1 400.00
|
2 000.00
|
0.00
|
| 4. Conditions for the integration of production capacity from renewable sources into the electricity system |
MW |
1 842.00
|
6 342.00
|
0.00
|
| 5. Increase of maximum monthly net cross-border transmission capacity by 1 600 MW |
MW |
0.00
|
1 600.00
|
0.00
|
Notes:
System.Threading.Tasks.Task`1[Microsoft.AspNetCore.Html.HtmlString]
Elements in light blue allow detailed view when selected
All amounts are in euro (EUR) / 1 EUR = 1,95583 BGN