BG-RRP-4.032-0309-C01
Construction of a Local Energy Storage System with an Installed Capacity of 0.4 MW for an Upcoming Photovoltaic Plant with an Installed Capacity of 0.92 MW in the "Meriyata" Area, Simitli, by "Georesurs" Ltd.
RRF ==> Recovery and Resilience Plan
176789460 MINISTRY OF ENERGY
07.03.2025
07.03.2025
31.03.2026
In execution (starting date)
Location of Performance
- Bulgaria, South-West and South Central Bulgaria (BG4), South-West (BG41), Blagoevgrad (BG413), Simitli, Simitli
