BG-RRP-4.032-0094-C01
Construction of new solar power generation capacities 0.999 MW with local storage facilities with an installed capacity 0.45 MW.
RRF ==> Recovery and Resilience Plan
176789460 MINISTRY OF ENERGY
21.02.2025
21.02.2025
31.03.2026
In execution (starting date)
Location of Performance
- Bulgaria, South-West and South Central Bulgaria (BG4), South Central (BG42), Haskovo (BG422), Topolovgrad, Topolovgrad
