BG-RRP-4.034-0123-C02
Project for construction of stand-alone Battery Energy Storage System (BESS) with rated power capacity of 40MW with direct optic connection to the telecommunication network of ESO EAD located on LP 72240.38.20 situated in Tenevo village, Tundzha municipality
RRF ==> Recovery and Resilience Plan
176789460 MINISTRY OF ENERGY
29.10.2025
29.10.2025
01.06.2026
In execution (starting date)
Location of Performance
- Bulgaria, North and South East Bulgaria (BG3), South-East (BG34), Yambol (BG343), Tundzha, Tenevo
