Saved trees
UMIS AND ITS USERS CONTRIBUTED TO SAVING 77 256 TREES
Български

Programme: Recovery and Resilience Plan

Planning region: All

Identification

BG-RRP-4.034-0123-C03
Project for construction of stand-alone Battery Energy Storage System (BESS) with rated power capacity of 40MW with direct optic connection to the telecommunication network of ESO EAD located on LP 72240.38.20 situated in Tenevo village, Tundzha municipality
176789460 MINISTRY OF ENERGY
29.10.2025
29.10.2025
24.08.2026
In execution (starting date)
Location of Performance
  • Bulgaria, North and South East Bulgaria (BG3), South-East (BG34), Yambol (BG343), Tundzha, Tenevo

Notes:

Elements in light blue allow detailed view when selected
All amounts are in euro (EUR) / 1 EUR = 1,95583 BGN
The project is funded by the “Technical Assistance” Programme 2021–2027, co-financed by the European Union through the European Regional Development Fund, under project BG16RFTA001-1.003-0001 “Digital transformation in the management of EU funds” and by the “National Recovery and Resilience Plan”, under Investment C10.I11 “Ensuring an adequate information and administrative environment for the implementation of the Recovery and Resilience Plan”.