Programme: Recovery and Resilience Plan

Planning region: All

Identification

BG-RRP-4.034-0123-C02
Project for construction of stand-alone Battery Energy Storage System (BESS) with rated power capacity of 40MW with direct optic connection to the telecommunication network of ESO EAD located on LP 72240.38.20 situated in Tenevo village, Tundzha municipality
176789460 MINISTRY OF ENERGY
29.10.2025
29.10.2025
01.06.2026
In execution (starting date)
Location of Performance
  • Bulgaria, North and South East Bulgaria (BG3), South-East (BG34), Yambol (BG343), Tundzha, Tenevo

Notes:

System.Threading.Tasks.Task`1[Microsoft.AspNetCore.Html.HtmlString] Elements in light blue allow detailed view when selected
All amounts are in euro (EUR) / 1 EUR = 1,95583 BGN
The project is financed by the Operational Programme "Technical Assistance" and co-financed by the European Union through the European Regional Development Fund.