BG-RRP-6.004-4025-C02
Technological and ecological modernization through the construction of an autonomous photovoltaic plant for the needs of ZP Shteryu Georgiev Takhov
RRF ==> Recovery and Resilience Plan
831909905 MINISTRY OF AGRICULTURE AND FOOD
10.06.2024
10.06.2024
10.06.2025
Contracted
Location of Performance
- Bulgaria, South-West and South Central Bulgaria (BG4), South Central (BG42), Pazardzhik (BG423), Peshtera, Peshtera
